翻訳と辞書
Words near each other
・ "O" Is for Outlaw
・ "O"-Jung.Ban.Hap.
・ "Ode-to-Napoleon" hexachord
・ "Oh Yeah!" Live
・ "Our Contemporary" regional art exhibition (Leningrad, 1975)
・ "P" Is for Peril
・ "Pimpernel" Smith
・ "Polish death camp" controversy
・ "Pro knigi" ("About books")
・ "Prosopa" Greek Television Awards
・ "Pussy Cats" Starring the Walkmen
・ "Q" Is for Quarry
・ "R" Is for Ricochet
・ "R" The King (2016 film)
・ "Rags" Ragland
・ ! (album)
・ ! (disambiguation)
・ !!
・ !!!
・ !!! (album)
・ !!Destroy-Oh-Boy!!
・ !Action Pact!
・ !Arriba! La Pachanga
・ !Hero
・ !Hero (album)
・ !Kung language
・ !Oka Tokat
・ !PAUS3
・ !T.O.O.H.!
・ !Women Art Revolution


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Marcellus and Joseph Jacobs : ウィキペディア英語版
Jacobs Wind
Jacobs Wind Electric Co. Inc.〔(Jacobs Wind Electric Company )〕 is the oldest renewable energy company in the United States. It has been designing consumer and commercial renewable energy systems sized to the changing distributed electric loads of their periods since the mid-1920s.
The firm was started and established by Marcellus and Joseph Jacobs, after local interest in their wind electric system for their family’s Montana Ranch, built in 1922,〔(Marcellus Jacobs biography ) (PDF)〕 brought them requests from neighbors to provide them with wind generated electric power as well.
M.L. & Joe moved the firm to Minneapolis in 1963 to begin production of improved wind/engine distributed energy systems which were sold in the U.S., Canada, and Mexico, as well as on every major continent, through a Dealer network that grew to over 300. Early Jacobs' machines included one taken to Antarctica by Richard Evelyn Byrd and installed (at Byrd's 'Little America') in 1933, running until 1955.〔(Righter ), p.95〕 Before production ceased in the late 1950s, about 20,000 Jacobs Wind Energy Systems (1 - 3 kW) were shipped from Minneapolis.
In the 80's via a partnership with Control Data a new line of production of Jacobs Wind Energy Systems began in Minneapolis, with marketing of larger 10 - 20 kW systems. Most of these 1,500+ wind systems produced from 1980-85 were grid connected. The majority of them went to pioneering windfarms in Hawaii and California.
In Minnesota, Jacobs units began being connected to Rural Electric Cooperative (REC) grids starting in 1981. Many of these systems are still on line to REC grids’ selling renewable wind power (AG-WATTS).
Today, the firm’s designers (several now in their 4th decade in the wind industry) are working with local RECs on a new generation of consumer renewable energy systems sized to ever larger consumer electric loads at distributed rural sites.
==References==

* Robert Righter, Wind Energy in America. Norman, Okla. : University of Oklahoma Press, April 1996. 361pp. ISBN 0-8061-2812-7

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Jacobs Wind」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.